skip to main | skip to sidebar

Thursday, May 24, 2007

Constrruction site visit #5 - Concrete poured onto site




I visited a site in Highton where concrete had just been poured onto the site by the construction workers.
Posted by Tom at 4:02 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

jonesy's blog

Am a 2nd year Architecture/Construction Management Student

jonesy's blog

Am a 2nd year Architecture/Construction Management Student

Blog Archive

  • ▼  2007 (22)
    • ▼  May (17)
      • Major Assignment detail
      • Article #5 - "Saving Energy: Homes Lead the Way"
      • Article #4 - "Housing lobby in 5 star mystery"
      • Article #3 - New Bussiness Options
      • Site Visit 6 - Pako street
      • Article #6 - "Skyscraper Design Gets a New Spin"
      • Constrruction site visit #5 - Concrete poured onto...
      • I came across a site where tilt up construction wa...
      • Site Visit #3 - Distribution Centre
      • Article #2 - Tilt up Construction, technique and m...
      • Article Review # 1- Tilt up Construction
      • Site Visit #2 - Bunnings Warehouse
      • Portal Frame Construction detail
      • Portal Frame construction detail
      • Portal Frame Section - Sheet roofing/concrete panel
      • Portal Frame detail - Bow Gutter Section
      • Portal Frame detail - Gutter section
    • ►  April (1)
    • ►  March (4)

About Me

Tom
View my complete profile